TITLE: draft standard schedule [ At the prompting of ACorreir@btrvtech.com, here is the schedule for the C++ DWP standardization process. -adc ] AUTHOR: clamage@pacific-88.Eng.Sun.COM Thu Mar 28 11:05:23 1996 I have attached the current version of the schedule. The final approved standard should differ very little from the version sent out for public comment in August/September. Here is the current schedule for completing the ISO draft standard. The schedule assumes that all votes are affirmative. If any vote rejects the draft standard, slip the schedule by at least 6 months from that point. Date Who What =========================================== 3/96 WG21 Mtg #15 7/96 WG21 Resolve CD ballot; Mtg #16. 8/96 WG21 Complete editorial corrections. 9/96 SC22 Final CD ballot 3 mos. (and ANSI public-comment period) 11/96 WG21 Mtg #17. 3/97 WG21 Mtg #18 7/97 WG21 Resolve Final CD ballot; Mtg #19. 8/97 WG21 Complete editorial corrections 9/97 JTC1 DIS ballot 4 mos. 11/97 WG21 Mtg #20. 3/98 WG21 Complete editorial corrections. ITTF receives IS from WG21 Editor for publication via SC22 secretariat (with final report). The ISO side of the C++ committee is WG21, which is under SC22, which is under JTC1. "CD" means Committee Draft, the draft standard which is voted on. When a CD is accepted, it becomes a Draft International Standard (DIS). After final approval, the DIS becomes an International Standard (IS). --- Steve Clamage, stephen.clamage@eng.sun.com Chair, ANSI C++ Committee X3J16